top of page
Site from west.jpg

PROJECTS

503 ON TENTH

Portland’s Newest Life Science Project 

The 503 On Tenth will be located in the heart of the Central Eastside Innovation Quadrant and will provide an environment necessary for Portland’s expanding bio-tech industry. The building will provide 312,000SF of BSL2 lab space and 65,000SF of creative office, conference and event space, along with 5,000 SF of retail on the ground floor with the potential of a child care center.  There will be parking for 100 cars below the ground floor level and easily accessed from the southwest corner at 9th and Washington. Delivering 2023.

LOCATION

Portland, OR

CATEGORY

Life Sciences

LEASE INFO
SUMMIT LEAD

Chris Marsh
503-708-9983

cmarsh@sdgpdx.com

PROJECT WEBSITE

808 ON ALDER

The Central Eastside Industrial District is a growing hub of innovation in the heart of Portland. 808 On Alder fulfills a drastically under-served market for wet biotech lab incubator space in the metro area, serving emerging health sciences and technology industries. The design will transform a two-story, concrete and wood-frame warehouse into 34,984 square feet of private, biotech-focused research wet laboratory space, along with a new penthouse for creative offices. Along with other sustainable design features including high-efficiency mechanical/electrical systems, the building is capped with an eco-roof, helping control building temperature while preventing excess storm-water runoff. 

Delivery Q1 2021.

LOCATION

Portland, OR

CATEGORY

Life Sciences

LEASE INFO
SUMMIT LEAD

Marty Surby

msurby@sdgpdx.com

PROJECT WEBSITE
220091 - Oregon City Mixed Use Entertainment Center (1).jpg
Mf Streetscape.jpg

ENTERTAINMENT, MIXED-USE

When built as proposed, we will create a vibrant and attractive gateway at Oregon City's north entrance: a place where residents and tourists will shop, dine, stroll, enjoy indoor family entertainment. The proposed development will clean up the 80-plus acre contaminated brownfield site, will create 1000’s of jobs and provide many other important economic impacts to the city and surrounding areas.
 

LOCATION

Oregon City, OR

CATEGORY

Mixed-Use Entertainment

LEASE INFO

Commercial Realty Advisors
Alex MacLean & Jeff Olsen
503-274-0211

SUMMIT LEAD

Seth Henderson

shenderson@sdgpdx.com

BASELINE APARTMENTS

Baseline Apartments consists of 104 market rate units in Gresham, Oregon, across four buildings and an amenity structure consisting of 98,000 GSF. Each 4-story building includes an elevator, roof deck, green roofs, and other elements bringing urban Class-A product to the suburbs. Anticipated delivery January, 2021.

 

LOCATION

Portland, OR

CATEGORY

Multi-Family 

LEASE INFO
SUMMIT LEAD-

Marty Surby

msurby@sdgpdx.com

BLOCK 3

Timberhouse is an 8-story apartment building with offices and ground-level retail. Timberhouse includes 230 apartments with 2,000 square feet of retail. It will be built at Block 3 of the waterfront development, on the west side of Esther Street near Vancouver City Hall. Anticipated delivery October, 2022.

LOCATION

Vancouver, WA

CATEGORY

Multi-Family 

LEASE INFO
SUMMIT LEAD

Marty Surby

msurby@sdgpdx.com

bottom of page